|
1. The
pool layout is carefully marked for precision.
|
|
|
2. The
dig begins the process for perfection.
|
|
|
3. The
hole is carefully prepared to achieve proper shape and
depth.
|
|
|
4. Now
that the parameters are correct, the pool is ready to be
set in place.
|
|
|
5. The
timely process of filling the pool with water begins. |
|
|
6. The
proper plumbing and electrical equipment is installed. |
|
|
7. The
concrete is poured around the pool and its foundation. |
|
|
8.
Your lifetime guaranteed Viking Pool. |
|